NAVAL OUTLYING LANDING FIELD
Imperial Beach, Ca
Phase II involved the design and installation of two urgent minor construction projects and two special projects. Stronghold renovated the existing Mobile Security Squadron Operations Facility, and provided a new pre-engineered building for an Operations facility and a new Inshore Boat Unit (IBU) 53, Operations / Administration Facility providing a new PEB.
The special projects included the consolidation, addition and repairs to Room 10-06 of Building 189 (4,491 sf) and Room 12-06 in Consolidated Boat and Vehicle Maintenance Facility (6,400 sf); the demolition, fencing, concrete repairs, insulation, doors, frames, hardware, framing and drywall, ceramic tile, acoustical ceiling, flooring, painting, toilet accessories, metal lockers, casework, fire sprinkler system, rough-in plumbing, plumbing fixtures, rough-in ductwork, set and connect equipment, controls, test and startup system, electrical rough-in, light fixtures, switchgear, electrical finish, and fire alarm in Building 156; the insulation in Building 184; and the earthwork, underground utilities, concrete repairs, and pre-fab metal building in Building 189.
Cost
$2.9 Million
Duration
December 2006
     to
August 2007
Project Type
General Construction
Square Footage
Over 10,000 Square Feet
Associated Builders and Contractors
San Diego Chapter
2007 Excellence In Construction Award
WHAT THEY SAY