Projects

PHOTOVOLTAIC SYSTEM at installation restoration site 7, BOX CANYON LANDFILL

Marine Corps Base

Camp Pendleton, Ca

Stronghold designed, procured, and constructed a complete solar photovoltaic system including balance of system components, electrical utilities, communication utilities, monitoring and metering, utility equipment building, and associated equipment and devices to occupy the approximately six (6) acres of closed landfill space. The design and construction approach to this project offered a solution that minimized impacts to the integrity, function, and useful life of the Evapotranspiration cover of the landfill. In addition, Stronghold presented the Navy a comprehensive schedule that showed successful completion in less than the required 465 calendar days while adhering to all requirements delineated in the Request for Proposal.